Property type guide · Orleans and Jefferson

Buying a Condo in New Orleans

With a condominium you are buying two things: a unit, and a share of an association. The unit is the easy part. Whether the association is solvent, insurable and financeable is what decides if the purchase works, and it is decided by documents most buyers never ask for.

Governing law
Louisiana Condominium Act
Financing hinge
Warrantable vs non-warrantable
Must review
Declaration, budget, reserves, insurance
Watch for
Special assessments and rental caps

Where the condo inventory actually is

New Orleans condominium stock falls into a few distinct groups, and they behave very differently. The Warehouse District and Central Business District hold conversions of nineteenth and early twentieth century commercial buildings, often with high ceilings, large windows, elevators and amenity space, and often with the maintenance profile of an old commercial building. The Lower Garden District and parts of the Garden District have smaller conversions carved out of large historic houses, sometimes only four to eight units, which means a very small association carrying the cost of a very old building.

Purpose-built condominium and townhome developments cluster more heavily in Metairie and along the lakefront, and they generally offer newer systems, parking and lower per-unit exposure to a single big repair. Lakefront and mid-rise buildings bring elevators, structural envelope and sometimes pools into the association’s maintenance obligation.

The smaller the association, the more each owner’s share of a roof or a foundation repair costs. A four-unit conversion in a hundred-year-old building is a fundamentally different financial proposition from a hundred-unit development, even at the same list price.

The documents we insist on reading

Condominiums in Louisiana are governed by the Louisiana Condominium Act, and the association’s own recorded documents fill in the rest. Before your inspection period closes we want the recorded declaration and any amendments, the bylaws, the current operating budget, the most recent financial statements, the reserve balance and any reserve study, at least a year of board meeting minutes, the master insurance policy declarations page, and written confirmation of any pending or contemplated special assessment and any litigation involving the association.

The minutes are the document buyers skip and the one that tells the truth. Budgets present intentions. Minutes record the roof discussion that has been deferred for three years, the assessment the board is arguing about, and the owner disputes that will eventually cost money. If an association is slow or unwilling to produce these, we treat that as information about the association.

On the insurance side, the master policy tells you what the association covers and where your own unit-owner policy has to pick up. Get that boundary in writing, because the gap between the two is a common and expensive surprise after a storm.

Warrantable, non-warrantable, and why your loan can die

This is the part that costs deals. Conventional financing on a condominium requires the project itself to be acceptable to Fannie Mae or Freddie Mac, not just the borrower. A project that meets their criteria is described as warrantable. If it does not, the loan you were pre-approved for may simply not be available on that unit.

The usual disqualifiers are a high proportion of investor-owned rather than owner-occupied units, too much of the building in one owner’s hands, HOA dues delinquency above the allowed threshold, inadequate reserve funding, significant commercial space in the building, active litigation involving the association, and deferred maintenance or unresolved structural issues. Since the 2021 Surfside collapse, lender questionnaires ask directly about structural integrity, deferred maintenance and special assessments, and Fannie Mae maintains a list of projects it will not lend on. A building can land on that list without unit owners being told.

FHA works differently again, with its own approved condominium list plus a single-unit approval process for units in otherwise unapproved projects. Non-warrantable does not mean unfinanceable, but it typically means a portfolio loan at a higher rate with a larger down payment. What it always means is that we want your lender to review the project before we are deep into a contract, not after the appraisal.

Short-term rentals, and not assuming

If your plan involves renting the unit short term, two separate sets of rules both have to permit it. The City of New Orleans regulates short-term rentals, and those regulations have been revised repeatedly and litigated, so current requirements need to be confirmed with the city rather than inferred from what was true a couple of years ago or from what a listing implies.

Independently of city law, the association’s own declaration and bylaws can prohibit or restrict short-term rentals, cap the number of units that may be rented at all, or impose minimum lease terms. An association restriction applies whether or not the city would permit the use. We have seen buyers purchase on the assumption that a city license settles the question, and it does not. Both documents get checked, and the answer goes in writing before you are committed.

Related reading: the cost of buying guide covers cash needed at closing, and the historic homes guide covers the review process that applies to many converted buildings.

Common questions

Condos in New Orleans, answered

The recorded declaration and amendments, the bylaws, the current budget and recent financial statements, the reserve balance and any reserve study, at least a year of board meeting minutes, the master insurance policy declarations page, and written confirmation of any pending special assessment or litigation. The minutes matter most, because they record the problems the budget has not yet acknowledged.

It means the project does not meet Fannie Mae or Freddie Mac criteria, so conventional financing is unavailable on that unit regardless of how strong your own qualifications are. Common causes are heavy investor ownership, dues delinquency, thin reserves, large commercial space, active litigation and deferred maintenance. Financing is often still possible through a portfolio lender, typically at a higher rate with a larger down payment.

Only if the project is on FHA’s approved condominium list, or if the unit qualifies under FHA’s single-unit approval process for units in unapproved projects. This is worth checking before you write an offer, because approval status is a property-level fact that has nothing to do with your credit.

It is a charge levied on owners beyond regular dues, usually for a major repair the reserves cannot cover. You find out by reading the board meeting minutes and asking the association in writing whether any assessment is pending or under discussion. A large deferred repair discussed in the minutes but absent from the budget is effectively an assessment that has not been voted on yet.

Partly, and the boundary is set by the declaration and the master policy. The association typically insures the building and common elements while you insure your interior, improvements, contents and liability through a unit-owner policy. Get that dividing line in writing, because the gap between the two policies is where storm claims turn into disputes.

Only if both the City of New Orleans and the association permit it. City short-term rental rules have changed repeatedly and been litigated, so current requirements have to be confirmed with the city. Separately, the association’s declaration and bylaws can ban short-term rentals or cap rentals entirely, and that restriction applies regardless of city law. Both get verified in writing before you commit.

They carry more concentrated risk. In a four-unit conversion of an old building, each owner holds a quarter of the cost of a new roof or a foundation repair, and there is rarely a reserve deep enough to absorb it. Large developments spread that cost, though they bring elevators, envelopes and amenities of their own. Neither is automatically better, and the financials tell you which one you are looking at.

No. The program covers existing primary residences and specifically excludes condominiums, along with new construction and mobile homes. Roof work on a condominium building is the association’s responsibility under the declaration, funded through reserves or an assessment.

Send us your criteria and contact us for a consultation.

Let's talk

Let’s read the documents before you sign.

Send us the building and we will pull the association file and get your lender to check the project first.