Property type guide · Orleans, Jefferson, St. Tammany

Buying New Construction in New Orleans

A new build is not a resale with better appliances. You sign the builder’s contract rather than the standard Louisiana purchase agreement, your warranty comes from a statute rather than a negotiation, and the decisions that cost the most are made before the slab is poured.

Warranty
Louisiana New Home Warranty Act
Coverage periods
1 year · 2 years · 5 years
The contract
Builder’s paper, not the standard form
Watch
Allowances, change orders, completion date

Two different markets

New construction around New Orleans splits into two things that share a label. Inside Orleans Parish it is mostly infill: one house or a small cluster on lots in established neighborhoods, frequently where something was demolished, often elevated to meet current requirements. Outside the parish, in Jefferson, St. Tammany and St. Charles, it is subdivision product, where a builder controls multiple lots and sells from a set of plans with an options list.

The buying experience differs accordingly. Subdivision purchases give you comparable sales inside the same development, a model home to walk, and a repeatable process. Infill purchases give you a specific block and a specific builder, thin comparables, and far more variability in quality. Elevation requirements are a live issue on both, and on an infill lot in the city the required finished floor height shapes the design and the cost before anything else does.

One thing catches infill buyers regularly. New construction inside a local historic district still requires a Certificate of Appropriateness from the Historic District Landmarks Commission, and new construction is reviewed by the full commission at a hearing rather than approved by staff. If you are buying a to-be-built house on a lot in a historic district, that review is on the critical path. The historic homes guide covers how that process runs.

The contract is the builder’s, and it is different

Resale transactions in Louisiana run on a familiar residential purchase agreement. Builder contracts do not. You will be handed the builder’s own form, and it is written to protect the builder. The provisions worth reading closely are the deposit and whether any part of it is refundable, the completion date and what happens when it slips, the allowance amounts for finishes and what happens when your selections exceed them, the change order process and its pricing, the inspection and walkthrough rights you actually have, whether disputes go to arbitration, and whether the builder’s preferred lender is a condition of any incentive.

Allowances deserve particular attention. A contract that allocates a modest allowance for flooring, fixtures or countertops and then prices your real selections as upgrades is how a base price becomes a final price twenty percent higher. We ask for the allowance schedule in writing and price a realistic selection against it before you sign, so the number you are budgeting is the number you will pay.

On incentives, builders frequently offer rate buydowns or closing cost credits conditioned on using their affiliated lender. Sometimes that is genuinely the better deal. Sometimes the incentive is smaller than what an independent lender saves you over the loan. Run both and compare, rather than accepting the framing that the incentive is free money.

Your warranty comes from statute

The Louisiana New Home Warranty Act, found at Louisiana Revised Statutes 9:3141 and following, gives the first purchaser of a new home three mandatory warranties from the builder, running from the warranty commencement date, which is the earlier of the date title transfers or the date you first occupy the home.

For one year, the home is warranted free of defects in materials and workmanship. For two years, the plumbing, electrical, heating, cooling and ventilating systems are warranted, excluding appliances, fixtures and equipment. For five years, the home is warranted against major structural defects, which the statute defines narrowly as actual physical damage to load-bearing elements such as foundations and footings, beams, girders, lintels, columns, walls and partitions, floor systems and roof framing systems, of a severity that makes the home unsafe, unsanitary or unlivable.

The procedure matters as much as the coverage. On discovering a defect you must give the builder written notice by registered or certified mail within one year of first knowing about it, and you must give the builder a reasonable opportunity to make repairs before doing the work yourself or filing suit. The warranty periods transfer to a later purchaser within the original window, and they run from the original commencement date rather than restarting on resale. Miss the notice requirement and you can lose a claim you would otherwise have won.

Inspect it anyway

The most common mistake in a new build purchase is skipping the independent inspection because the house is new and the municipal inspector already signed off. Municipal inspection confirms code compliance at specific stages. It is not a quality review, and it is not on your behalf.

Hire your own inspector, and where the builder permits it, inspect during construction rather than only at the end. A pre-drywall inspection sees framing, mechanical rough-in, plumbing and electrical while they are still visible and cheap to correct. A final inspection before closing produces the punch list you negotiate against. Once you close, everything moves onto the warranty process, which is slower and more adversarial than a punch list resolved before funding.

Before closing, confirm the certificate of occupancy has issued, get the warranty documentation the builder is required to provide, register any manufacturer warranties on systems and appliances, and get quotes for homeowners insurance on the finished house. New construction often insures more favorably than older stock, and if the roof was built to the IBHS FORTIFIED standard, ask for the certificate, since it carries value and transfers on resale.

Related reading: the cost of buying guide for closing figures, English Turn if you are considering building on a lot, and the historic homes guide for infill in a historic district.

Common questions

New construction, answered

We think so, and it costs you nothing extra in most cases. The salesperson in the model home works for the builder. We read the builder’s contract on your behalf, price your selections against the allowance schedule before you sign, compare the builder’s lender incentive against independent financing, and hold the punch list before closing rather than after.

The Louisiana New Home Warranty Act provides three mandatory warranties from the builder: one year on defects in materials and workmanship, two years on plumbing, electrical, heating, cooling and ventilating systems excluding appliances and fixtures, and five years on major structural defects to load-bearing elements. The periods run from the earlier of title transfer or first occupancy and transfer to a later buyer within the original window.

Give the builder written notice by registered or certified mail within one year of first learning about the defect, and give the builder a reasonable opportunity to repair it before you do the work yourself or file suit. The notice requirement is strict, and missing it can cost you a claim that would otherwise have been valid.

Yes. Municipal inspection confirms code compliance at set stages and is not a quality review performed for you. Where the builder allows it, inspect before drywall goes up so framing and rough-in are still visible, then again before closing to build the punch list you negotiate against.

Fixed amounts the contract allocates toward finishes such as flooring, fixtures and countertops. Selections above the allowance are charged as upgrades, which is how a base price becomes a final price well above it. Ask for the allowance schedule in writing and price a realistic set of selections against it before signing.

Run both and compare the total cost. A rate buydown or closing cost credit tied to the affiliated lender is sometimes the better deal and sometimes worth less than what an independent lender saves you over the life of the loan. You are entitled to shop, and the comparison takes one conversation.

Yes. New construction in a New Orleans local historic district requires a Certificate of Appropriateness, and unlike minor in-kind work it goes before the full Historic District Landmarks Commission at a public hearing rather than being approved by staff. Build that review into your timeline before you commit to a lot.

It depends entirely on what the contract says, which is why the completion and delay provisions are among the first things we read. Some builder contracts give you meaningful remedies and some give you almost none. If you are financing with a rate lock or coordinating the sale of a current home, a slipped completion date has real cost, and that risk belongs in the negotiation.

Tell us what you are considering and contact us for a consultation.

Let's talk

Let’s read the contract before you sign it.

Send us the builder’s paperwork and the allowance schedule. That review is where new build purchases are won or lost.